-
Pavel Emelyanov authored
There are tests (e.g. on locks) that can conflict with each other, so wait for all the other jobs to finish before running such. v2: Wait for the excl test to finish before launching more of them. Signed-off-by:
Pavel Emelyanov <xemul@parallels.com>
a9632060